| Clause 7.6 | ||
| Question : | Does CSA N285.6.4-05, Clause 7.6 require UT inspection of outer tubing (4.6” diameter x 0.052” wall thickness) used for Liquid Zone Control assemblies? | |
| Answer : | No. The requirements of N285.6.4-06, Clause 7.6 are specific only to UT inspections of calandria tubes prior to flaring. | |